Construction cost & performance intelligence

See where project costs diverge, down to the BOQ item

Turn your BOQ and period updates into item-level performance analysis, cost forecasts and executive reports. See which items contribute most to cost variance and where your team should focus its review.

The sample project is public — no signup needed.

BOQ Performance

Utility Corridor — Package 3 · P7

Budget (BAC)

USD 145.0M

approved

Earned value (EV)

USD 57.1M

39.4% of BAC earned

Actual cost (AC)

USD 62.1M

illustrated at P7

Cost variance (CV)

−USD 5.0M

unfavorable

CPI

0.92

target ≥ 1.00

Division rollup

earned value vs actual cost by division

Division

Items

Budget

EV

AC

CV

CPI

D03 · Concrete

142

38.0M

22.4M

22.0M

+0.4M

1.02

D31 · Earthwork

68

20.0M

12.1M

11.4M

+0.7M

1.06

D22 · Plumbing

96

16.0M

6.8M

6.9M

−0.1M

0.99

D23 · HVAC

74

22.0M

7.2M

8.0M

−0.8M

0.90

D26 · Electrical

118

40.0M

7.3M

11.4M

−4.1M

0.64

Uncategorized

23

9.0M

1.3M

2.4M

−1.1M

0.54

Project total

521

145.0M

57.1M

62.1M

−5.0M

0.92

Top cost contributors

Unfavorable cost variance by package · D26 · Electrical, this period.

Cable tray (PO-0417) · D26

PO-0417 · Delayed · +32d

−2.4M

MV switchgear · D26

−1.2M

Other D26 items

−0.5M

Division 26 · Electrical total

−4.1M

BOQ Performance

Utility Corridor — Package 3 · P7

Budget (BAC)

USD 145.0M

approved

Earned value (EV)

USD 57.1M

39.4% of BAC earned

Actual cost (AC)

USD 62.1M

illustrated at P7

Cost variance (CV)

−USD 5.0M

unfavorable

CPI

0.92

target ≥ 1.00

Division rollup

earned value vs actual cost by division

Division

Items

Budget

EV

AC

CV

CPI

D03 · Concrete

142

38.0M

22.4M

22.0M

+0.4M

1.02

D31 · Earthwork

68

20.0M

12.1M

11.4M

+0.7M

1.06

D22 · Plumbing

96

16.0M

6.8M

6.9M

−0.1M

0.99

D23 · HVAC

74

22.0M

7.2M

8.0M

−0.8M

0.90

D26 · Electrical

118

40.0M

7.3M

11.4M

−4.1M

0.64

Uncategorized

23

9.0M

1.3M

2.4M

−1.1M

0.54

Project total

521

145.0M

57.1M

62.1M

−5.0M

0.92

Top cost contributors

Unfavorable cost variance by package · D26 · Electrical, this period.

Cable tray (PO-0417) · D26

PO-0417 · Delayed · +32d

−2.4M

MV switchgear · D26

−1.2M

Other D26 items

−0.5M

Division 26 · Electrical total

−4.1M

Illustrative example. Not client data.

01 / ITEM PERFORMANCE

Trace a cost overrun from the project total to the items behind it.

An illustrative project and reporting period. Follow the variance down: project → division → item.

Cost variance · P7

−USD 5.0M

1 · Project

Cost variance at P7. Earned value is USD 57.1M against an actual cost of USD 62.1M; CPI is 0.92.

2 · Division

Division 26 · Electrical accounts for USD 4.1M of the USD 5.0M net cost variance, with a CPI of 0.64.

3 · Item

Cable tray (PO-0417) is the largest single contributor, and its delivery is 32 days past the required date.

Illustrative example. Not client data.

1 · Project

−USD 5.0M

Cost variance at P7. Earned value is USD 57.1M against an actual cost of USD 62.1M; CPI is 0.92.

Illustrative example. Not client data.

2 · Division

−USD 4.1M

Division 26 · Electrical accounts for USD 4.1M of the USD 5.0M net cost variance, with a CPI of 0.64.

Illustrative example. Not client data.

3 · Item

−USD 2.4M

Cable tray (PO-0417) is the largest single contributor, and its delivery is 32 days past the required date.

Illustrative example. Not client data.

Explore the product with a sample project.

Explore dashboards, BOQ performance and reporting in the public demo. Its data differs from these illustrations.

Public demo. Illustrations use different data.

02 / KEY RESULTS

Know where cost is going, where it will land, and what to report.

Every chart answers one question using illustrative data.

Which items are driving the overrun?

The top three contributors account for USD 4.7M of unfavorable variance.

Top cost contributors

Unfavorable cost variance by package, this period.

Cable tray (PO-0417) · D26

−2.4M

MV switchgear · D26

−1.2M

Unclassified items

−1.1M

HVAC ductwork · D23

−0.8M

Plumbing fixtures · D22

−0.1M

Illustrative example. Not client data.

S-curve — cumulative value

PV (planned)65.6MEV (earned)57.1MAC (actual)62.1M
020406080USD MStartP1P2P3P4P5P6P7P7 · Jun 2026
PV (planned)65.6MEV (earned)57.1MAC (actual)62.1M
020406080USD MP1P2P3P4P5P6P7P7

Illustrative example. Not client data.

Is earned value keeping up with cost — and where will we finish?

At P7, actual cost (USD 62.1M) is running USD 5.0M ahead of earned value (USD 57.1M). At current cost efficiency, the forecast at completion is USD 157.6M against a USD 145.0M budget.

Which divisions are underperforming on cost?

CPI by division against the 1.00 target.

CPI by division

D03 · Concrete

1.02

D31 · Earthwork

1.06

D22 · Plumbing

0.99

D23 · HVAC

0.90

D26 · Electrical

0.64

Uncategorized

0.54

CPI (EV ÷ AC)

Target 1.00

Illustrative example. Not client data.

How did the period perform?

Schedule and cost indices, cost variance and the forecast at completion for P7.

Illustrative example. Not client data.

Which deliveries threaten the schedule?

Cable tray delivery is 32 days past its required date.

Package status

91 tracked packages

Delivered on time

38

Delivered late

9

In transit

31

At risk

8

Delayed

5

Package

Div

Status

Var.

Cable tray assemblies

D26

Delayed

+32d

Illustrative example. Not client data.

What goes to the steering committee?

An executive PDF for each period.

First page of the actual BM Hotel Towers demo executive report, showing its project overview and sample EVM values.
See the sample report ↓

Illustrative example. Not client data.

03 / THE PROBLEM

Cost reporting is still assembled by hand.

At every cutoff, BOQ quantities, progress and actual cost are gathered from separate files and checked manually — usually after the period has closed.

01

Scattered data.

BOQ, progress and cost sit in separate files that don’t line up on their own.

02

Manual rework.

Earned-value calculations are rebuilt by hand every period.

03

Late answers.

Variance is found after the cutoff, when it’s hardest to act on.

04 / HOW IT WORKS

Three steps from your files to a report.

1

Upload

2

Map columns

3

Review

4

Import

XLS

Not sure of the format?

Download a sample BOQ with the columns we recognise, filled with example data.

Illustrative upload preview

.xlsx, .xls or .csv · all sheets are scanned; you pick the sheet

01 · Upload

Add your BOQ and period data.

Excel (.xlsx, .xls) or CSV. A downloadable template shows the fields we read.

XLS

Not sure of the format?

Download a sample BOQ with the columns we recognise, filled with example data.

Illustrative upload preview

.xlsx, .xls or .csv · all sheets are scanned; you pick the sheet

Illustrative example. Not client data.

02 · Performance review

See how the period performed and what’s driving it.

Schedule and cost performance, cost variance and forecast: SPI · CPI · CV · EAC.

Illustrative example. Not client data.

03 · Report

Export an executive report for the period.

Review project performance and prepare a period report.

Illustrative example. Not client data.

05 / WHO USES IT

Built for the teams accountable for project cost.

Contractors

Track execution cost against budget and find the items running over.

What you’ll need:

BOQ, period progress and actual cost.

PMCs & consultants

Review reported progress and cost across packages and issue one consistent period report.

What you’ll need:

BOQ plus the progress and cost data submitted each period.

Owners

Follow progress and earned value against plan across your projects.

What you’ll need:

BOQ or contract values and reported progress. Cost performance (CPI) needs actual cost data from the contractor.

06 / TRUST & SAMPLE REPORT

See how every figure is calculated.

SPI = EV ÷ PV. CPI = EV ÷ AC. CV = EV − AC. EAC = BAC ÷ CPI assumes current cost efficiency continues.

Calculation ledger

Illustrative example · P7 · Jun 2026

Inputs · P7 · Jun 2026

BAC (budget)

USD 145.0M

PV (planned value)

USD 65.6M

EV (earned value)

USD 57.1M

AC (actual cost)

USD 62.1M

Formula → result

SPI = EV ÷ PV

0.87

CPI = EV ÷ AC

0.92

CV = EV − AC

−USD 5.0M

EAC = BAC ÷ CPI

USD 157.6M

Assumes current cost efficiency continues.

Illustrative example. Not client data.

First page of the actual BM Hotel Towers demo executive report, showing its project overview and sample EVM values.

Illustrative example. Not client data.

Illustrative example. Not client data.

Explore the sample report

View sample report

English sample. No signup.

Pricing

Plans for individuals and companies.

For individuals

Starter

For individual planners getting started with intelligent project controls.

$29/month

  • Up to 2 projects
  • Excel upload (Planned vs Actual)
  • Automatic SPI / CPI / SV / CV
  • Basic S-curve visualization
  • Basic BOQ upload
  • Basic BOQ summary (division / section)
  • Basic PDF export (watermarked)
  • Email support
Start free trial

Professional

Full intelligence for serious project controls — BOQ, AI, and executive reporting.

$49/month

  • Up to 5 projects
  • Advanced BOQ Performance analysis
  • Actual Quantity & Actual Cost tracking
  • Item-level CPI / CV / progress analysis
  • AI BOQ insights & Project Advisor · early access
  • Advanced S-curve with forecasting
  • Executive PDF reports (no watermark)
  • Procurement tracking
  • Trend analysis & priority actions
Start free trial

08 / FAQ

Frequently asked questions

See where your project’s costs diverge.

Start a free trial, or explore the public sample project without signing up.